Structural repairs to over 50 yr old Factory, Cadbury Thane
project-cadbury

Problem:

  • Due to environmental impact over the years the RCC Structures were badly damaged due to corrosion of the embedded steel.
  • First major repairs undertaken for plant

 

Solution:

  • Total isolation was created during repairs with Bison paneling or False temporary mezzanine floor so that the regular production is not disturbed or contaminated.
  • Damged steel was treated with anticorrosive coatings and corrosion inhibhitors.
  • Cracked sections were grouted with food grade epoxy grout to suit the standards.
  • RCC Elements were rebuilt with Microconcrete and wrapped with GFRP
  • All external were treated with elastomeric waterproof paint.
  • Work was carried out in phases as per schedule.