Structural retrofitting of columns on highrise in Thane

retrofitting

Problem :

  • Construction fault at site resulted in lower strength of concrete and eccentric columns on intermediate floors.

    Solution :

  • Columns RCC was grouted to improve its microstructure of concrete
  • GFRP wraps were applied on the structural elements to tackle with the deficiency

Scroll to Top