Strengthening Masonry Walls, South Mumbai

Masonry

Problem:

  • 90 years old brick masonry building
  • Floor to floor height 20 feet
  • Client created additional floor of 10 feet each in between
  • Additional floor load caused failure of brick columns

Solution:

  • Support was provided immediately prior to carrying out the repairs.
  • All the damaged brick columns were wrapped with bidirectional glass fiber wraps
  • After wrapping brick piers were grouted with polymers cement slurry
  • The job was completed in 4 days
  • Showing excellent performance for last 7 years

Strengthening Of Fire Damaged Cold Storage Structure, Navi Mumbai