Fabrication of server room Floor for an MNC bank In Fort, Mumbai

bkc-fort

 

Problem:

  • Increased dead load on floor due to a server room for which it was not designed

Solution

  • Hot dip galvanized MS fabrication was done to create a false floor and transfer the load to the column capital.
  • All fabrication was carried out at workshop and final assembly by bolting was done at site due to working area constraints.
  • All this was carried out including shifting of the steel members commercial district of Mumbai for a leading MNC bank.