Structural repairs to textile factory at vapi

vapi

textile

 

Problem:

  • Due to a construction defect beams showed shear cracks.
  • Beams were to be upgraded to carry extra load

Solution:

  • Proper covering of machinery to avoid any damages.
  • Cracked sections were grouted with monomer grout.
  • Stiffening of beams was carried out using Steel Sections.

RCC Beams were wrapped with GFRP as per design requirement


Scroll to Top