Banks/Data Center
MNC Bank in Fort, Mumbai
MNC Bank in Fort, Mumbai
Problem:
- Increased dead load on floor due to a server room for which it was not designed
Solution
- Hot dip galvanized MS fabrication to create a false floor. Load transferred to the column capital.
- Fabrication was carried out at workshop and final assembly by bolting was done at site due to working area constraints.
Heritage Building in Mumbai
Heritage Building in Mumbai
Problem:
- 75-year-old structure with marble slab facade. MS pins supporting the slabs had corroded, thus the slabs started falling
Solution:
- Waterproofing of the facade and terrace
- Corrosion repairs on the supporting RCC structure
- Re-fixing of stone slabs using custom designed SS pins
- Cleaning of the stones to restore the historic glory