Hotels and Clubs
Hotel Building Near Powai
Hotel Building Near Powai
Problem:
- Additional load of kitchen equipment called for strengthening of beams
- Separation crack was observed at end of lift shaft and shear wall
Solution :
- Beams were analyzed for additional load.
- A glass fiber wrapping system was designed and applied to tackle the additional load on beams.
- Crack were opened up and sealed with epoxy inner cavity was grouted with epoxy grouts.
- System of prestressed and non-prestressed carbon fiber laminates and fiber wraps was applied on shear-wall.
Taj Connemara, Chennai
Taj Connemara, Chennai
Problem :
- Over a considerable period of time corrosion and carbonation had affected the RCC columns of a hotel building in the coastal area of Chennai
- NDT reports indicated performance level in mid and lower range
Solution:
- Consultant had suggested for steel treatment and Section built-up using PMM
- Columns were wrapped with single layer of glass fiber wrap improving durability and strength.
- Work was carried out giving due attention to safety and cleanliness.
Otters Club in Bandra
Otters Club in Bandra
Problem:
- More than 50 years old structure in CRZ zone.
- Impractical to demolish and reconstruct so a major restoration work was executed.
- Exposure to marine environment damages to RCC and plinth were mainly observed.
Solution:
- Soil stabilization and strengthening of plinth beam with conventional structural steel.
- Structural elements were treated for corrosion damages, damaged RCC sections were re-cast.
- Conventional waterproofing for terrace slab.
- Microstructure of concrete was improved using epoxy grouting and durability aspect was taken care with corrosion inhibitors and further wrapped using GFRP wraps.
- Sanrachana was entrusted the responsibility and delivered successfully in line with client’s expectations
Oberoi Hotel, New Delhi
Oberoi Hotel, New Delhi
Problem :
- Hotel building showed corrosion damages due to environmental exposure over a period of time
Solution :
- Steel Treatment for corrosion protection
- Application of corrosion inhibitors
- Damaged concrete section was rebuilt using polymer modified mortar and concrete.
- Work was carried in adherence to strict shutdown timelines